cropped-cropped-Egy-German-Logo-01.png

egypt german projects

  • Home
  • About Us
  • Services
    • Turn-Key Projects implement
      • Civil Works
      • Steel Works
      • Infrastructure
      • Mep Systems
      • Industrial Logistics
  • Projects
  • Blog
  • العربية
  • Contact Us
✕
  • Home
  • About Us
  • Services
    • Turn-Key Projects implement
      • Civil Works
      • Steel Works
      • Infrastructure
      • Mep Systems
      • Industrial Logistics
  • Projects
  • Blog
  • العربية
Published by eslam atef on February 3, 2026
Categories
  • Projects
  • DateFebruary 3, 2026
Projects

EVA Project

EVA Project

We are proud to present the EVA Project, a fully integrated industrial development covering an area of 24,000 square meters, designed with state-of-the-art storage and administrative facilities to meet all business needs.

Service:

Turnkey Industrial

Industry:

Industrial Construction

Published​:

January 2023

#IndustrialProjects #Construction #Warehouses #Turnkey #Engineering #MEP #FireSystems #Infrastructure #ProjectManagement

EVA Project

EVA Project is a fully integrated industrial development spanning 24,000 m², designed to provide efficient storage and administrative facilities supported by modern infrastructure and high safety standards.

Project Scope:
The project includes three fully equipped warehouses, including a Cold Store Warehouse for chilled and frozen storage, along with a four-story administrative building featuring a main reception, fire water tank, and fire pump room. The scope of work covered site preparation, structural and roofing works, internal slabs and flooring, as well as the complete execution of fire fighting, fire alarm, electrical, air conditioning, and lighting systems.

Project Details

Outcome:
The EVA Project delivers a fully integrated industrial facility spanning 24,000 m², combining high-efficiency warehouses, a modern four-story administrative building, and advanced safety infrastructure. It provides a seamless operational environment that supports business efficiency, safety, and modern industrial standards.

Key Features:

  • Three fully equipped warehouses, including a Cold Store Warehouse for chilled and frozen storage

  • Four-story administrative building with main reception, professional front desk, fire water tank, and fire pump room

  • Complete execution of site preparation, structural works, steel roofing, and internal slabs & flooring

  • Installation of Fire Fighting and Fire Alarm systems for maximum safety

  • Full Electrical Works, Air Conditioning systems, and Lighting to ensure operational readiness

Related posts

February 8, 2026

United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said


Read more
February 8, 2026

Al-Awayed Project – Alexandria


Read more
February 3, 2026

Sudan Hangar Project – Cotton Gin


Read more
cropped-cropped-Egy-German-Logo-01.png

Find us here:

Services
  • Civil Works
  • Steel Works
  • Mep Systems
  • Infrastructure
  • Industrial Logistics
Our address

Villa 1
block 15050
7th district
obour city

Shortcut links
  • Home
  • About Us
  • Services
    • Turn-Key Projects implement
      • Civil Works
      • Steel Works
      • Mep Systems
      • Infrastructure
      • Industrial Logistics
  • Projects
  • Blog
Contact with us
  • +201095885883
  • +201095885883
  • Contact Us

© 2025 All Rights Reserved - BSMART Creative Agency