Al-Awayed Project- Alexandria
Al-Awayed Project – Alexandria
The scope included excavation and reinforced concrete works, full foundation and structural construction, execution of steel structures with high-specification sandwich panel cladding, construction of a two-floor administrative building with a total area of 2,000 m², preparation of service facilities with 600 m³ fire water tanks, installation of fire fighting and fire protection systems, implementation of racking systems and logistics equipment including forklifts, and installation of lighting and HVAC systems to guarantee efficient warehouse operations.
Service:
Turnkey Industrial
Industry:
Industrial Construction
Published:
January 2023
#IndustrialProjects #Construction #Warehouses #Turnkey #Engineering #MEP #FireSystems #Infrastructure #ProjectManagement
Al-Awayed Project- Alexandria
Al-Awayed Project – Alexandria | United Company for Pharmacists is a turnkey industrial warehouse project executed by the Egypt German Company, covering a total area of 6,000 m². The project was delivered fully operational, aligned with technical, operational, and safety standards to support efficient pharmaceutical storage and logistics operations.
Project Scope:
We delivered a complete turnkey warehouse solution including civil works, steel structure and cladding systems, administrative and service buildings, fire protection systems, logistics equipment, lighting, and HVAC systems. The project covered all phases from construction and infrastructure preparation through system commissioning and final handover, ensuring the client could immediately operate the facility upon delivery.
Project Details
Outcome:
The Al-Awayed Project – Alexandria | United Company for Pharmacists was successfully delivered as a fully operational turnkey warehouse facility, ready for immediate use upon handover. The project reflects comprehensive execution across civil, structural, architectural, and electromechanical works, ensuring efficient pharmaceutical storage and logistics operations with high safety and operational standards.
Key Features:
- Turnkey warehouse project covering 6,000 m²
- Complete civil works including excavation, concrete, and structural foundations
- Steel structure execution with high-specification sandwich panel cladding
- Two-floor administrative building with a total area of 2,000 m²
- Service building preparation with 600 m³ fire water tanks
- Installation of fire fighting and fire protection systems
- Racking systems, forklifts, and integrated logistics equipment
- Implementation of lighting and HVAC systems for efficient operations