United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said
United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said
The scope included excavation and reinforced concrete works, full foundation and structural construction, execution of steel structures with high-specification sandwich panel cladding, construction of a two-floor administrative building with a total area of 2,000 m², preparation of service facilities with 600 m³ fire water tanks, installation of fire fighting and fire protection systems, implementation of racking systems and logistics equipment including forklifts, and installation of lighting and HVAC systems to guarantee efficient warehouse operations.
Service:
Turnkey Industrial
Industry:
Industrial Construction
Published:
January 2023
#IndustrialProjects #Construction #Warehouses #Turnkey #Engineering #MEP #FireSystems #Infrastructure #ProjectManagement
United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said
United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said is an industrial warehouse modernization project executed by the Egypt German Company. The project included full replacement and renovation works for a warehouse facility covering approximately 4,600 m², in addition to a two-story administrative building with a total area of 500 m², ensuring upgraded operational performance and compliance with safety standards.
Project Scope:
The project involved complete dismantling, refurbishment, and repainting of the existing steel hangar structure, full demolition and preparation of upgraded flooring systems, construction of fire fighting water tanks, and installation of advanced fire protection pump systems. All works were executed to enhance warehouse safety, operational efficiency, and structural reliability.
Project Details
Outcome:
The United Company for Pharmacists Warehouse Renovation & Replacement Project – Port Said was successfully completed as a fully modernized and upgraded warehouse facility. The project enhanced structural performance, improved safety infrastructure, and ensured reliable operational readiness while maintaining high industrial and quality standards.
Key Features:
- Complete replacement and renovation of a 4,600 m² steel hangar warehouse
- Two-story administrative building with a total area of 500 m²
- Dismantling, refurbishment, and repainting of existing steel structure
- Full demolition and preparation of upgraded flooring systems
- Construction of 12 fire fighting water tanks with a total capacity of 600 m³
- Installation of fire fighting pump systems for full facility protection
- Warehouse modernization aligned with safety and quality standards